Good News, Bad News – 2015 May 05

Good News: Our building permit will not expire at the end of the month. Bad News: Staining is taking longer than expected and pushing back other work.

Fireplace Framing 2014 May 28

The fireplace framing and hearth stone platforms are built.  Our fireplace installer suggested that a 2×4 be placed on the platform so that the firebox can sit raised.  The stud at the top of the firebox opening will also need to be raised.